In ship construction, frame spacing is _______.
A.greater at the bow and stem
B.reduced at the bow and stem
C.uniform over the length of the vessel
D.uniform over the length of the vessel, with the exception of the machinery spaces, where it is reduced due to increased stresses
正确答案是B