During the 'ALTERNATE FLAPS OPERATION' procedure, you have to pl

分类: 选择题 教员版 下 发布时间: 2023-12-01 12:13 浏览量: 1

During the 'ALTERNATE FLAPS OPERATION' procedure, you have to plan a Flaps 15 landing. After arming the ALTERNATE FLAPS MASTER SWITCH (230 kt max), you set the flaps to desired flap position & extend flaps on maneuvering speed schedule. The LE FLAPS TRANSIT light will remain illuminates until the flaps approach the:

A.A.Flaps 1 position

B.B.Flaps 5 position

C.C.Flaps 10 position

D.D.Flaps 15 position

正确答案是C